PreFeasibility
Challenger Declares Completion of Hualilan Toll Milling Pre-Feasibility Examine
Key Highlights Additional constructive, near-surface, oxide gold-antimony drillholes at Resurrection Ridge together with: LB018: 1.47 g/t AuEq* over 74.7 meters (0.23% Sb and 0.45 g/t Au), together with 3.59 g/t AuEq* over 18.2 meters (0.60% Sb and 0.92 g/t Au ), and in addition together with 4.61 g/t AuEq* over 6.0 meters (0.96 % Sb […]